01

Why Version a Formula?

"I changed the formula a little" is the most expensive sentence in perfume production. If a change was made but not recorded, then a year later, when a customer says "the old scent was better", nobody knows what the old scent was. Which formula was the IFRA certificate issued for? Which proportions was the allergen declaration calculated on? Which version was the stability test run on?

Formula versioning means numbering every change to an approved formula and recording it together with its rationale and its effects. Change control is the process of evaluating and approving that change before it is made. Together they keep the question "which lot was made with which formula" answerable at all times.

This system is not for mods at the development stage; mods are free. Versioning starts the moment a formula goes into production.

A production formula is a frozen document. It is not overwritten, corrected or "updated". If a change is needed, a new version is opened; the old version stays in the archive as it is.
02

Version Number: Major and Minor Changes

A simple and sufficient system has two digits: Vmajor.minor. The major digit is for changes that alter the scent, the minor digit for changes that do not.

Type of changeExampleVersionChecks required
Minor: scent unchanged, composition changed for a practical reasonDifferent dilution of the same molecule; solvent brand; rounding correctionV1.0 → V1.1Weighing list, cost
Minor: equivalent raw material substitutionSame CAS, different supplier; same quality natural oil, different originV1.1 → V1.2Triangle test, density, short stability test
Major: change in proportionHedione 8% → 12%; musk base increasedV1.x → V2.0IFRA, allergens, stability, compatibility, cost, customer approval
Major: raw material replacedLilial removed, another molecule put in its placeV2.x → V3.0All of the above + regulatory check

Every version has its own IFRA and allergen calculation; even if the result comes out the same for a minor change, the calculation is redone and filed under the version number. The link between document and formula is the version number.

The product name does not change; the version number is invisible to the customer. What the customer knows is "Vetiver EDT"; what you know is "Vetiver EDT V2.3", and that number appears in every lot record.

03

Change Control: Step by Step

Change control puts a form between "let's change it" and "we changed it". The form can be short; what matters is that every step has an answer and a signature.

  1. Request and rationale

    Who wants to change what, and why? "Raw material X cannot be sourced", "the customer wants more longevity", "the IFRA amendment lowered the limit". There is no change without a rationale.

  2. Impact assessment

    What does the change affect: scent, IFRA compliance, allergen declaration, label, stability, base compatibility, cost, regulation. For each heading, write "not affected" or "this test is required".

  3. Trial and testing

    The new version is prepared in a small batch; the tests set out in the impact assessment are run. For a major change, a triangle test and short stability are the minimum.

  4. Approval

    The responsible person approves (in a small business this is often one person, but still in writing). For a customer-specific formula, customer approval is obtained and filed.

  5. Update the documents

    The new version's formula sheet, IFRA and allergen calculation, weighing list, cost card. The old version is marked "archive", not deleted.

  6. Set the effective lot

    "V2.0 is effective from batch number 2026-0412." This line fixes for ever which lot was made with which version.

  7. Manage stock

    If there is product made with the old version or labels already printed, write down what happens to them: sold, relabelled or withdrawn.

FIGURE 01Process Strip — Step by Step
🔹1. Request andrationale Who…✅2. Impactassessment What…✅3. Trial andtesting The new…🔹4. Approval Theresponsible…🔹5. Update thedocuments The new…🔹6. Set theeffective lot "V2
The change control form should be one page. A form that runs over two pages does not get filled in; the form that does not get filled in is where the system collapses.
04

Archive and Traceability: From Lot Back to Formula

The system's test is a single question: "Which formula was this bottle made with?" The answer must be found in three steps: the batch number on the bottle, the version number in the batch record, the formula sheet in the version archive. If it cannot be found in three minutes, the system is not working.

For each version the archive holds: the formula (as pure substances and as a weighing list), the raw material lots with which it was first validated, the IFRA and allergen calculation, stability and compatibility results, the change control form, the effective date and lot, the approval. Old versions are not deleted; they are marked "V1.0 – valid 03.2024 – 11.2025".

In a digital archive, the file name carries the version number and the file is write-protected. In a paper archive, each version is a separate sheet, with version and date at the top of the page. In a spreadsheet, each version is a separate tab; overwriting a single tab called "current" is the exact opposite of versioning.

For customer-specific formulas the archive doubles: the version the customer approved and the approval letter are filed together. When the customer says a year later "we never approved this", the answer is in the archive.

05

Frequently Asked Questions

The most common questions about formula versioning.

I run a small business and I am the only formulator; do I still need this?
Yes. Versioning is not about accounting to others but to yourself a year from now. In a one-person business the system can be simpler, but the principles are the same.
I changed supplier for a molecule with the same CAS number; should I open a version?
A minor version (V1.1 → V1.2) is opened and a triangle test is run. Same CAS does not mean same scent; purity and isomer distribution can differ.
Where exactly is the line between a mod and a version?
Production approval. Up to approval every trial is a mod and is free; after approval every change is subject to versioning and change control.
Can I keep selling product made with the old version?
If the change is not driven by regulation or safety, yes; the change control form states "old stock to be sold". If it is regulatory, the transition date decides.
Should I put the version number on the label?
No; the batch number is enough. The batch record shows the version. A version number on the label raises unnecessary questions with the customer.
Does the customer have to know about a formula change?
For a customer-specific formula, yes; every major change is submitted for their approval. Even for your own brand, if the scent changes the customer notices; informing them in advance prevents complaints.
What happens when an IFRA amendment arrives?
Change control is opened for every affected formula: limit check, reformulation if needed, new version, effective lot set according to the transition date.
Which software should I use?
A spreadsheet is enough to begin with: each version a separate tab, the change form a separate sheet. Once the number of formulas runs into the hundreds, formula management software is worth considering.